Hot Work & Energy Isolation Permit Template — free, no sign-up Download PDF

Hot Work & Energy Isolation Permit Template

A combined hot work permit and energy isolation record for worksites where ignition sources meet flammable process. Two parts — the permit that authorises the work, and the isolation register that proves the energy was actually removed and verified before anyone struck an arc.

How to use it. Complete Part 1 before work begins and keep it at the work location while the permit is live. Complete Part 2 for every isolation point. Nothing starts until both are signed, and the permit is formally closed when the fire watch ends.
To print: Click "Print" below → select Portrait orientation → enable Background graphics in print settings → Print.
To fill in: Print and complete by hand, or use your browser's "Save as PDF" and fill the fields in any PDF editor.
Want your permit system reviewed?
HSE Advisor Canada is CRSP Certified, COR & ISO 45001 Lead Auditors. We will review what you have written, confirm it lines up with the requirements in your province, and help you close the gaps. The first conversation is free.

Want our most-requested checklists by email?

This resource is free to read, print and use right here — no sign-up. We can also email you our most-requested free checklists and templates. The full library is always at Free HSE Resources.

We send occasional Canadian OHS updates. Unsubscribe any time.

Hot Work Permit

Part 1 of 2 · Valid for one shift unless otherwise stated
HSE ADVISOR CANADA
hseadvisor.ca
Company:
Site / facility:
Permit number:
Location of work:
Date:
Valid from / to:
A. The work

Description of work:

Equipment or system:   Work order:

Type: (welding, cutting, grinding, brazing, open flame, spark-producing tool, other)

Performed by:   Company:

B. Pre-work hazard controls
ControlConfirmed before work startsY / N / N-AEvidence or gap
Alternative to hot work consideredCold cutting, mechanical fastening or removal to a designated hot work area was considered and rejected for a recorded reason.
Area cleared of combustiblesCombustible material removed to a safe distance or protected with fire blankets.
Openings coveredDrains, ducts, floor openings, cracks and conveyors covered or sealed.
Flammable process isolatedAdjacent process lines and vessels isolated, drained and purged as required.
Sewers and drains protectedVapour path from drains considered and controlled.
Fire suppression at handCorrect extinguisher type present and in date; hose or suppression available as required.
Ventilation adequateFume extraction and general ventilation adequate for the process and space.
Barriers and signageArea barricaded; screens in place to protect other workers from arc flash and sparks.
Simultaneous operations reviewedOther work in the area reviewed for conflict.
C. Atmospheric testing

Test immediately before work starts and at the frequency set below. Record every test — a permit without test times is not evidence of anything.

TimeLEL %Oxygen %H₂S / toxicTester initialsResult

Detector make / serial:   Bump test / calibration date:

Re-test frequency required:   Continuous monitoring in place:

Stop work if any reading moves outside the acceptable range set by your site procedure, if the detector alarms, or if conditions change. Re-test and re-authorise before restarting.
D. Fire watch
RequirementWhat good looks likeY / N / N-AEvidence or gap
Fire watch assignedA named person, not an additional duty for the welder.
Trained and equippedTrained in extinguisher use and alarm raising; extinguisher in hand.
Present throughoutPresent for the whole of the work, including breaks.
Post-work monitoringContinues for the period required by your site procedure after work ends, then checks again before leaving.
Means of raising alarmRadio or alarm point confirmed working before work starts.

Fire watch name:   Post-work watch duration required:

Watch ended at:   Final area check by:

E. Authorisation — work may not start until all three sign
F. Permit closure
  • Work complete or suspended, and the area left safe
  • Post-work fire watch completed and area re-checked
  • Equipment and tools removed; barriers cleared
  • Isolations removed under Part 2, or handed over in writing
  • Area returned to operations
Hot Work & Energy Isolation Permit Template · HSE Advisor Canada · Free to use and adapt.
hseadvisor.ca · (647) 620-5278

Energy Isolation Register

Part 2 of 2 · One line per isolation point
HSE ADVISOR CANADA
hseadvisor.ca
Permit number:
Equipment / system:
Isolation performed by:
Date:
A. Energy sources to isolate

Tick every source present. An isolation that misses one source is not an isolation.

  • Electrical — including control circuits and backup or standby supply
  • Process fluid or gas — including flammables and toxics
  • Hydraulic
  • Pneumatic / compressed air
  • Steam or hot fluid
  • Mechanical — springs, counterweights, suspended loads, rotating mass
  • Gravity — raised equipment or stored material
  • Thermal — residual heat or cold
  • Chemical — reaction or accumulation
  • Other:
B. Isolation point register
#Isolation point / deviceEnergy typeMethod (lock, blind, spade, disconnect)Lock / tag IDApplied byVerified by
C. Stored-energy release and verification
RequirementWhat good looks likeY / N / N-AEvidence or gap
Stored energy releasedPressure bled, springs relaxed, capacitors discharged, loads lowered or blocked.
Drain and vent openLeft open where the procedure requires, to prove and maintain the isolation.
Zero-energy verified at the work pointVerified by test at the point of work — try-to-start, gauge reading, or instrument test.
Verification method recordedHow zero energy was proven, not just that someone says it was.
Personal locks appliedEvery worker on the job has applied a personal lock to the group device.

Zero-energy verification method used:

Verified by:   Time:

Verification is the step that gets skipped. A lock on a device proves a lock was applied. Only a test at the point of work proves the energy is gone.
D. Workers holding locks
Name (print)Lock IDLock appliedLock removedSignature
E. De-isolation and return to service
  • Work complete and tools accounted for
  • Guards and covers refitted
  • All personnel clear and warned that energy is being restored
  • All personal locks removed by the person who applied them
  • Blinds and spades removed and recorded
  • Equipment tested and returned to operations
Energy Isolation Register · HSE Advisor Canada · Free to use and adapt.
hseadvisor.ca · (647) 620-5278

This template is general guidance, not legal advice, and does not replace a site-specific procedure written by a competent person. Confirm every requirement against the current regulation and your own process hazard analysis before use.