Winter Hazard Assessment Addendum Template Free PDF, no sign-up Download PDF (314 KB)

Winter Hazard Assessment Addendum Template

This addendum adds the winter hazards to a workplace hazard assessment and safety program. WCB Nova Scotia's analysis of nearly 1,700 snow and ice claims found injuries usually spike one to three days after major weather events, so the inspection routine in Section 2 runs for 72 hours after every storm. Sections 3 to 7 cover the hazards that are easy to overlook: roof and skylight access, snow equipment around pedestrians, temporary heat, manual shovelling and the snow removal contractor.

How to use it. Complete Sections 1 to 8 once, before the first snowfall, then use the log on the last page after every storm. Replace every blank with a real name, number or time.
To print: Click "Print" below → select Portrait orientation → enable Background graphics in print settings → Print.
To fill in: Print and complete by hand, or save as PDF and add text in any PDF editor.
Want your winter controls reviewed before the first storm?
HSE Advisor Canada is CRSP Certified, COR & ISO 45001 Lead Auditors. We will review your addendum and your snow contract, confirm the requirements for your province, and help you close the gaps. The first conversation is free.

Get the editable Word version

The PDF is free to read and print, no sign-up needed. If you want a copy you can edit with your company name, sites and contacts, we will email you the Word file. The full library is at Free HSE Resources.

We send occasional Canadian OHS updates. Unsubscribe any time.

Winter Hazard Assessment Addendum

Seasonal addendum to the workplace hazard assessment · Canadian employers
HSE ADVISOR CANADA
hseadvisor.ca
Employer / company:
Site(s) covered:
Prepared by:
Position:
Season start:
Season end / review date:
1. Who owns what

Every winter task needs one named person. A role with no name is a gap.

RoleNameBackupPhone
Winter program owner
Post-storm inspector (every shift pattern)
Manager of the snow contractor relationship
Receives injury notices and claims
Approves any roof access
Other
2. Storm trigger and the 72-hour inspection routine

A storm for this site is:

Define it with a number you can check, such as snowfall depth, any freezing rain, or a thaw followed by a freeze. Surfaces that look clear can still be icy, especially in shade and early in the morning.

WhenMinimum actionWhoDone by (time)
Day 0 (storm)Confirm contractor is on site. Close or barrier any area that cannot be made safe before the next shift.
Day 1Walk entrances, dock doors, smoking shelters, ramps, walkways and the lot before the first shift. Treat and re-treat shaded areas. Record the walk.
Day 2Re-inspect shaded areas, ramps and building corners before the first and last shifts. Record the walk.
Day 3Repeat Day 2. Close out the storm log and note what failed.
  • Shift schedule for days 1 to 3 set before the storm, with flexibility where conditions are hazardous
  • Winter footwear or ice cleats with good traction required, and a stock kept on site
  • Inspection record kept for the whole season (see the log on the last page)
Winter Hazard Assessment Addendum · Page 1 · HSE Advisor Canada · Free to use and adapt.
hseadvisor.ca · (647) 620-5278

Winter Hazard Assessment Addendum

Roofs, equipment and pedestrians
HSE ADVISOR CANADA
hseadvisor.ca
3. Roof, skylight and elevated access register

Snow hides skylights, vents and hatches. Map them before the snow falls. Complete one row per roof, trailer yard, canopy or elevated surface where snow could accumulate.

Roof / surfaceSkylights, vents, hatches (count, mapped Y/N)Does snow need to come off? (Y/N, why)Method (ground / equipment / worker access)Fall protection and training confirmed (Y/N)
  • Nobody goes on a roof until the method, fall protection and training are confirmed for that person
  • Roof snow work does not start in poor light
  • Ladder rungs and footing checked for frost and ice, and no vehicle moved while anyone is on a ladder attached to it
  • The contractor's roof method is in writing, including who trains and equips the people they send up

Fall protection trigger height in this jurisdiction, and the provision:

Example: Saskatchewan, OHS Regulations, 2020, s. 9-2(2) requires a fall protection system where a worker may fall three metres or more, or where injury is possible from a shorter fall. Other provinces set their own thresholds. Confirm the current wording for yours.

4. Snow equipment and pedestrians
RequirementWhat good looks likeY / N / N-AEvidence or gap
Timing of heavy workPiling and hauling scheduled for when the lot is closed or nearly empty.
Work zone markedBarriers or cones around the machine, with a separate marked route for pedestrians.
Activities kept out of the zoneCart collection, deliveries, smoke breaks and parking are excluded while equipment runs.
Minimum distance setStated and communicated. After a 2023 fatality CNESST recommended that anyone who must be in the lot stay at least 9 m from a snow removal vehicle. It is a recommendation, not a regulatory minimum.
Spotter for reversingA trained spotter or camera and alarm in use when reversing near people.
Tenants and staff notifiedTold before the equipment arrives, with a named contact.
Operator briefed and equippedVisible clothing, working alarms and lights, and a pre-use equipment inspection.
Winter Hazard Assessment Addendum · Page 2 · HSE Advisor Canada · Free to use and adapt.
hseadvisor.ca · (647) 620-5278

Winter Hazard Assessment Addendum

Temporary heat and shovelling
HSE ADVISOR CANADA
hseadvisor.ca
5. Temporary heat and enclosed work

Fuel-burning heaters, generators, propane equipment and forklifts all produce carbon monoxide. It builds up in poorly ventilated spaces, including semi-enclosed areas sheltered with tarps and plastic sheeting.

RequirementWhat good looks likeY / N / N-AEvidence or gap
Installed to the instructionsEvery heater set up as the manufacturer states, including valve settings that are locked where required.
Exhaust vented outdoorsWhere the manufacturer requires it, and re-checked when tarps or doors change.
CO monitoringDetectors with alarms where fuel-burning equipment runs in a closed or tarped space. On Ontario construction projects, s. 47 of O. Reg. 213/91 requires CO testing under a written strategy where an internal combustion engine runs in an enclosed space. Confirm how it applies to your heaters.
Not left runningEquipment shut off when no one is using it.
Symptoms knownCrew trained to recognize headache, dizziness, nausea and confusion. Move to fresh air and call 911.

Carbon monoxide exposure limit in this jurisdiction (8-hour and short-term):

Ontario sets limits through Regulation 833. Other provinces have their own. Record the current value and source.

6. Manual shovelling
  • Named people assigned to shovel, instead of whoever is nearest the door
  • Crew briefed to push snow rather than lift and throw it, and to shovel early and often because fresh snow is lighter
  • Work and rest schedule used on cold or windy days, with breaks and warm fluids
  • Warm-up before starting, and workers with health concerns told to speak to their doctor
  • De-icer or sand applied after clearing, with the amount and time recorded
Winter Hazard Assessment Addendum · Page 3 · HSE Advisor Canada · Free to use and adapt.
hseadvisor.ca · (647) 620-5278

Winter Hazard Assessment Addendum

Contractor oversight and sign-off
HSE ADVISOR CANADA
hseadvisor.ca
7. Snow removal contractor oversight
RequirementWhat good looks likeY / N / N-AEvidence or gap
Written scopeSnow depth that triggers a visit, response time, ice treatment, and whether roofs are in or out.
Contractor visit logDate, time, areas cleared and treated, kept for the season and compared with your own inspection log.
Insurance and coverageCurrent workers’ compensation coverage and liability insurance on file, checked again mid-season.
Roof and pedestrian methodsBoth in writing before the first storm.
Notice routingOne named person receives injury notices and, the same day, serves a copy on the other occupiers and the contractor by personal service or registered mail, keeping proof of service.
ReviewContract and log reviewed after the first major storm.
Ontario sites: the 60-day notice rule. Under s. 6.1 of the Occupiers' Liability Act (in force January 29, 2021), no action for personal injury caused by snow or ice can be brought unless written notice of the claim is served within 60 days of the injury. It goes to the occupier or the contractor employed to remove snow or ice, states the date, time and location, and is served personally or by registered mail. Whoever receives it must pass a copy to the other parties. Late or defective notice can be excused where there is a reasonable excuse and the defendant is not prejudiced, and the rule does not apply if the injured person died. The two-year limitation period still applies. Record the injury date, work out day 60 from it (not from the day the notice arrived), and give your insurer the dates immediately. This rule covers premises you occupy; injuries on municipal roads and sidewalks follow different, shorter notice rules. Confirm how it fits your leases and contracts with your lawyer and insurer. It is a civil-claim rule and does not replace duties under the OHSA.

Person who receives notices:   Phone:

8. Sign-off
Winter Hazard Assessment Addendum · Page 4 · HSE Advisor Canada · Free to use and adapt.
hseadvisor.ca · (647) 620-5278

Post-Storm Inspection Log

One sheet per storm · Keep for the whole season
HSE ADVISOR CANADA
hseadvisor.ca
Storm date:
Snowfall / conditions:
Site:
Contractor on site (time):
Inspection record
Day / timeArea inspectedCondition foundAction taken (treated, closed, reported)Initials
Incidents and injury notices
DatePerson and what happenedNotice received (date, how)Copy served on (name, method, date)Injury date and day 60
Post-Storm Inspection Log · Page 5 · HSE Advisor Canada · Free to use and adapt.
hseadvisor.ca · (647) 620-5278
Want help applying this?

Our consultants (CRSP Certified · COR & ISO 45001 Lead Auditors) can adapt this to your workplace or review your safety program with you.

(647) 620-5278 · info@hseadvisor.ca · hseadvisor.ca/contact

Winter Hazard Assessment Addendum Template · Version 1.0 · Reviewed October 2026 · HSE Advisor Canada. Free to use and adapt. General guidance, not legal advice.

Scan to contact us

This resource is general guidance, not legal advice. Confirm every requirement against the current regulation in your jurisdiction before relying on it.